Method
Prioritizing the audit: which racks to survey first
An estate cannot be surveyed all at once. The audit page ranks each rack in the inventory by its status and builds a visit plan: the racks that matter most come first.

Contents
A field team rarely has time to photograph every rack in an estate at each campaign. Choices must be made. And choosing at random, or in aisle order, often means revisiting known racks while others have never been seen.
The “Audit campaigns” page answers a single question: which racks should be surveyed first? It starts from the inventory, looks at the history of photo surveys, and ranks each rack. This article explains the rules behind this ranking, and how to use it to prepare a visit.
Five statuses, one order
Each rack declared in the inventory gets a status, calculated from its last photo survey and what has changed since in the reference inventory. There are five possible statuses, ranked from most to least urgent.
| Status | What it means | Priority |
|---|---|---|
| Never surveyed | No photo of this rack has been compared with the inventory. | 1 |
| Modified since the survey | The rack’s inventory has changed after the last survey. | 2 |
| Old survey | The last survey exceeds the chosen validity period. | 3 |
| Pending discrepancies | The survey found discrepancies that have not been handled yet. | 4 |
| Up to date | Recent survey, no open discrepancy, reference inventory unchanged. | — |
The order follows a simple logic. A never-surveyed rack is a complete unknown: you do not know whether the inventory is right. A rack modified since the survey has been touched, at least in the reference inventory, and the photo no longer proves anything. An old survey has lost value over time. Finally, a rack with pending discrepancies is known: the problem is identified, and it remains to be handled at the office, often without going back to the room.
How long a survey stays valid
At the top of the page, a selector sets how long a survey is considered valid: 3 months, 6 months or 12 months. This setting moves racks from “up to date” to “old survey”, and therefore changes the visit plan.
The right setting depends on the pace of your work. A room where equipment is installed and removed every week justifies a short validity. A stable technical room can make do with one year. Nothing prevents you from changing the setting from one campaign to another: the page recalculates immediately.
Reading the top of the page
Before the details, the page gives an overview of the estate: number of racks in the inventory, coverage (share of racks with a valid survey), average match rate of surveyed racks, number of racks to survey and number of racks modified since their survey. A bar summarizes the breakdown of the five statuses.
On the demo bench, the page counts 54 racks in the inventory. Coverage is 9.3%: 49 racks are to be surveyed, and 4 racks have pending discrepancies. This is typical of a start: most of the estate has never been seen, and the priority is obvious.
The visit plan
Below the figures, the visit plan lists the racks in the order in which to survey them: first by status priority, then by site, then by rack name. This double sort matters as much as the priority itself: at equal priority, racks of the same site follow each other, and within a site they follow name order. The technician does not have to cross the city between two racks.
Tabs filter the list: racks to survey, those with pending discrepancies, those up to date, or all. A search finds a rack, a site or a room. Each line shows the rack’s location, the number of declared devices, its status, the date of the last survey and its match rate, with a button to start a survey directly.
The “By site” column gives, for each site, the number of racks to survey, the coverage and the match rate. Clicking a site filters the visit plan on that site: handy for preparing a technician’s day.
Preparing a day of surveys
Choose the validity
Set the validity period according to the pace of the room or the campaign.
Filter the site
In the “By site” column, click the site visited that day: the plan now shows only its racks.
Export the plan
The “Campaign plan (CSV)” button produces the ordered list, to send to the field team or to load into your work order tool.
Survey in order
On site, the technician photographs the racks following the list, from field mode on a phone.
Handle at the office
Surveys come back compared with the inventory. Discrepancies are handled line by line, with approval before anything is written.
The next day, the page has updated itself: surveyed racks move to “up to date” or “pending discrepancies”, coverage increases, and the visit plan proposes what comes next.
Pending discrepancies: office work
Racks with pending discrepancies come last in field priority, and that is not an oversight. The survey has already done its job: it has shown, U by U, where the photo and the inventory diverge. What remains is a decision: correct the inventory, or confirm that the reference inventory is right and that work is needed in the room.
Letting these discrepancies pile up nevertheless distorts the picture of the estate. A good pace is to handle discrepancies as you go, ideally within the week of the survey, with two-level approval if your organization separates the person who proposes from the person who approves.
What the page does not decide for you
The ranking is deliberately simple and readable. It knows neither the business criticality of a rack, nor your access constraints, nor the maintenance windows. If a sensitive room must come before all others, filter it and survey it first: the page is there to inform the choice, not to impose it.
To go further on organizing a visit across several sites, read Preparing a multi-site survey campaign.